Guide for the Installation of Shielding Cable Trays for Underground Lines

Guide for the Installation of Shielding Cable Trays for Underground Lines

The Cable Trays Shielding underground shall be installed with an overlap of approximately 200 mm, to ensure the electrical continuity.

In the next step, they will place the cables in the training specified in the project (in Clover or Flanked).

Installed the cables of energy, in the last stage we will be installed the covers, always with the overlap of approximately 200 mm and subsequently coupled with the underlying channel by means of metal hooks spring, at a distance of about 300 mm.